Xinjiang Oil & Gas ›› 2023, Vol. 19 ›› Issue (4): 69-74.DOI: 10.12388/j.issn.1673-2677.2023.04.009
• OIL AND GAS DEVELOPMENT • Previous Articles Next Articles
Numerical Simulation for Peeling Failure of Cement Plug-Formation Interface in Plugged Section of Old Wells
1. CNPC Research Institute of Engineering Technology Co.,Ltd.,Changping 102206,Beijing,China;
2. National Engineering Research Center for Oil & Gas Drilling and Completion Technology,Changping 102206,Beijing,China;
3. College of Petroleum and Natural Gas Engineering,Changzhou University,Changzhou 213000,Jiangsu,China.
老井封堵段水泥塞-地层界面剥离失效数值模拟
1.中国石油集团工程技术研究院有限公司,北京昌平 102206;
2.油气钻完井技术国家工程研究中心,北京昌平 102206;
3.常州大学石油与天然气工程学院,江苏常州 213000。