|
[1]曹龙龙,梁健,张恒春,等. 深部大陆科学钻探取心技术现状与发展趋势[J].钻探工程,2026,53(4):24-35. Cao Longlong,Liang Jian,Zhang Hengchun,et al. Status and development trend of coring technology for deep continental scientific drilling[J]. Drilling Engineering,2026,53(4):24-35.
[2]孙金声,刘伟,张炳军,等. 万米深地塔科 1 井的钻井和测井技术及其应用前景[J]. 石油学报,2026,47 (4):905-919.Sun Jinsheng,Liu Wei,Zhang Bingjun,et al. Drilling and logging technologies for the 10 000-meter deep Well Shenditake 1 and their application prospects[J]. Acta Petrolei Sinica,2026,47(4):905-919.
[3]郭威,钟秀平,贾瑞,等.泥浆地面降温调控特深钻探井筒泥浆温度的分析研究[J/OL].钻探工程,1-9[2026-07-25].ttps://link.cnki.net/urlid/10.1730.TD.20251118.1738.002.Guo Wei,Zhong Xiuping,Jia Rui,et al. Analysis of surface drilling fluid cooling for wellbore temperature regulation in extra-deep drilling[J/OL]. Drilling Engineering,1-9[2026-07-25]. https://link.cnki.net/urlid/10.1730.TD.20251118.
1738.002.
[4]刘锋报,孙金声,王建华.国内外深井超深井钻井液技术现状及发展趋势[J].新疆石油天然气,2023,19(2):34-39.Liu Fengbao,Sun Jinsheng,Wang Jianhua. A global review of technical status and development trend of drilling fluids for deep and ultra-deep wells[J]. Xinjiang Oil & Gas,2023,19(2):34-39.
[5]Cohen J,Rogers J D,Malcore E,et al. The quest for high temperature MWD and LWD tools[J]. GasTIPS,2002,8(4):8-12.
[6]王春生,冯少波,张志,等.深地塔科1井钻井设计关键技术[J].石油钻探技术,2024,52(2):78-86.Wang Chunsheng,Feng Shaobo,Zhang Zhi,et al. Key technologies for drilling design of Well Shendi Take-1[J]. Petroleum Drilling Techniques,2024,52(2):78-86.
[7]Ramey H J Jr. Wellbore heat transmission[J]. Journal of Petroleum Technology,1962,14(4):427-435.
[8]Wooley G R. Computing downhole temperatures in circulation,injection,and production wells[J]. Journal of Petroleum Technology,1980,32(9):1509-1522.
[9]Raymond L R. Temperature distribution in a circulating drilling fluid[J]. Journal of Petroleum Technology,1969,21(3):333-341.
[10]Hasan A R,Kabir C S. Aspects of wellbore heat transfer during two-phase flow[J]. SPE Production & Facilities,1994,9(3):211-216.
[11]Zhang Z,Xiong Y M,Mao L J,et al. Transient temperature prediction models of wellbore and formation in well-kick condition during circulation stage[J]. Journal of Petroleum Science and Engineering,2019,175:266-279.
[12]Chen X,Wang S W,He M,et al. A comprehensive prediction model of drilling wellbore temperature variation mechanism under deepwater high temperature and high pressure[J]. Ocean Engineering,2024,296:117063.
[13]Liu H,Wang Z Y,Sun Q,et al. An improved thermal model for predicting wellbore temperature distribution in deep-water gas well[J]. Applied Thermal Engineering,2022,205:118029.
[14]李梦博,许亮斌,罗洪斌,等.深水高温钻井井筒循环温度分布与控制方法研究[J].中国海上油气,2018,30(4):158-162.Li Mengbo,Xu Liangbin,Luo Hongbin,et al. Study on wellbore circulating temperature distribution and control method in deep water high temperature wells[J]. China Offshore Oil and Gas,2018,30(4):158-162.
[15]林日亿,程浩浩,杨恒林,等.超深水平井钻井液循环温度场模拟计算与分析[J].石油与天然气化工,2022,51(3):91-97.Lin Riyi,Cheng Haohao,Yang Henglin,et al. Temperature field simulation and analysis of drilling fluid circulation in super deep horizontal wells[J]. Chemical Engineering of Oil and Gas,2022,51(3):91-97.
[16]Yang A,Zhu Z X,Zhang N,et al. Solution and analysis of wellbore temperature and pressure field coupling model under lost circulation[J]. ACS Omega,2022,7(32):28675.
[17]Chen X,He M,Xu M B,et al. Fully transient coupled prediction model of wellbore temperature and pressure for multi-phase flow during underbalanced drilling[J]. Geoenergy Science and Engineering,2023,223:211540.
[18]He M,Zhang Y H,Xu M B,et al. A Multiphase wellbore flow model for sour gas “kicks”[J]. Fluid Dynamics & Materials Processing,2020,16(5):1031-1046.
[19]Yang H W,Li J,Zhang G,et al. Wellbore multiphase flow behaviors during gas invasion in deepwater downhole dual-gradient drilling based on oil-based drilling fluid[J]. Energy Reports,2022,8:2843-2858.
[20]Wu Z Y,Xu L,Li B,et al. Hydrothermal coupling model between wellbore and permafrost for drilling in arctic cold regions[J]. International Journal of Heat and Mass Transfer,2024,235:126236.
[21]高永海,尹法领,张党生,等.水合物储层水平井钻井井筒-储层耦合模型与井壁稳定性分析[J].石油学报,2023,44(7):1151-1166.Gao Yonghai,Yin Faling,Zhang Dangsheng,et al. Wellbore-reservoir coupling model and borehole stability analysis of horizontal well drilling in hydrate reservoirs[J]. Acta Petrolei Sinica,2023,44(7):1151-1166.
[22]Abdelhafiz M M,Hegele L A Jr,OPPELT J F. Numerical transient and steady state analytical modeling of the wellbore temperature during drilling fluid circulation[J]. Journal of Petroleum Science and Engineering,2020,186:106775.
[23]Yang M,Lou D Y,Chen Y H,et al. Establishing a practical method to accurately determine and manage wellbore thermal behavior in high-temperature drilling[J]. Applied Energy,2019,238:1471-1483.
[24]Sun W T,Wei N,Zhao J Z,et al. Wellbore temperature and pressure field in deep-water drilling and the applications in prediction of hydrate formation region[J]. Frontiers in Energy Research,2021,9:696392.
[25]Lyu X R,Zhang S C,He Y Y,et al. Numerical investigation on wellbore temperature prediction during the CO2 fracturing in horizontal wells[J]. Sustainability,2021,13(10):5672.
[26]张政.钻井过程中复杂工况下的井筒温度分布研究[D].四川成都:西南石油大学,2019:29-31.Zhang Zheng. Study on wellbore temperature distribution during drilling under complicated working conditions[D]. Chengdu,Sichuan:Southwest Petroleum University,2019:29-31.
[27]文乾彬,邵传辉,刘勇,等.钻井过程中钻井液循环温度数值模拟[J].新疆石油天然气,2011,7(4):28-32.Wen Qianbin Shao Chuanhui,Liu Yong,et al. Numerical simulation of drilling fluid circulating temperatures in drilling processes[J]. Xinjiang Oil & Gas,2011,7(4):28-32.
[28]Khaled M S,Wang N,Ashok P,et al. Real-time prediction of bottom-hole circulating temperature in geothermal wells using machine learning models[J]. Geoenergy Science and Engineering,2024,238:212891.
[29]Yuan Y,Li W Q,Bian L H,et al. A prediction model for pressure and temperature in geothermal drilling based on physics-informed neural networks[J]. Electronics,2024,13(19):3869.
[30]Xie J H,Zhang J,Cheng Y X,et al. Real-time prediction of wellbore temperatures in deep shale gas drilling using a combination of PINN and heat transfer models[J]. Applied Thermal Engineering,2025,279:127984.
[31]Raissi M,Perdikaris P,Karniadakis G E. Physics-informed neural networks:A deep learning framework for solving forward and inverse problems involving nonlinear partial differential equations[J]. Journal of Computational Physics,2019,378:686-707.
[32]李美春,丁扬,孙金声,等. 井筒降温技术研究现状及未来展望[J]. 石油学报,2025,46 (4):789-800.Li Meichun,Ding Yang,Sun Jinsheng,et al. Research progress and prospect of wellbore cooling technology[J]. Acta Petrolei Sinica,2025,46(4):789-800.
[33]Saito S,Sakuma S. Frontier geothermal drilling operations succeed at 500°C BHST[J]. SPE Drilling & Completion,2000,15(3):152-161.
[34]刘彪,李双贵,杨明合,等.钻井液温度控制技术研究进展[J].化学工程师,2019(1):4.Liu Biao,Li Shuanggui,Yang Minghe,et al. Research progress on drilling fluid temperature control technology[J]. Chemical Engineer,2019 (1):4.
[35]朱浩铭,彭俊威,郗秦阳,等. 钻井液冷却装置技术发展现状及展望[J]. 钻探工程,2024,51(2):8-14.Zhu Haoming,Peng Junwei,Xi Qinyang,et al. Technology development status and prospect of drilling fluid cooling equipment[J]. Drilling Engineering,2024,51(2):8-14.
[36]El Dorry K,Coit A,Garza Gutierrez C,et al. Drilling mud cooler opens up new automated drilling markets in hot hole applications[C]//SPE/IADC Drilling Conference and Exhibition. London:SPE,2015:SPE-173105-MS. DOI:10.2118/173105-MS.
[37]Soliman A A. Oil base mud in high pressure,high temperature wells[C]//SPE Middle East Oil and Gas Show and Conference. Bahrain:SPE,1995:SPE-29864-MS.
[38]赵江鹏,孙友宏,郭威.钻井泥浆冷却技术发展现状与新型泥浆冷却系统的研究[J].探矿工程(岩土钻掘工程),2010,37(9):1-5.Zhao Jiangpeng,Sun Youhong,Guo Wei. Current situation of drilling mud cooling technology and research on a new type of drilling mud cooling system[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling),2010,37(9):1-5.
[39]高杭,刘海涛. 钻井液冷却系统概念设计[J]. 石油矿场机械,2007,36(6):31-32.Gao Hang,Liu Haitao. Concept design for drilling fluid cooling system[J]. Oil Field Equipment,2007,36(6):31-32.
[40]芦云,杨玉精,王建林. U形管海水冷却钻井液的探索[J].中国石油和化工标准与质量,2012,33(11):161.Lu Yun,Yang Yujing,Wang Jianlin. Exploration of drilling fluid cooling with U-shaped tubing in seawater[J]. China Petroleum and Chemical Standard and Quality,2012,33(11):161.
[41]张贵磊.钻井液海水冷却器换热设计计算与应用[J].自动化技术与应用,2020,39(1):9-12.Zhang Guilei. Design calculation and application of heat exchanger for drilling fluid seawater cooler[J]. Techniques of Automation and Applications,2020,39(1):9-12.
[42]李亚伟,王斌斌,董怀荣,等.钻井液地面冷却系统方案设计及关键参数计算[J]. 中外能源,2020,25(S1):117-122.Li Yawei,Wang Binbin,Dong Huairong,et al. Design and key parameter calculation of surface drilling fluid cooling system[J]. Sino-Global Energy,2020,25(S1):117-122.
[43]李胜忠,张铜鋆,聂军,等.ZLZY310 高温钻井液冷却系统研制及应用[J].石油机 械,2022,50(8):46-51.Li Shengzhong,Zhang Tongjun,Nie Jun,et al. Development and application of ZLZY310 high temperature drilling fluid cooling system[J]. China Petroleum Machinery,2022,50(8):46-51.
[44]郗秦阳,彭俊威,戴启平,等.ZLQ030-75 型高温钻井液冷却装置研制[J].石油矿场机械,2023,52(4):53-58.Xi Qinyang,Peng Junwei,Dai Qiping,et al. Development of ZLQ030-75 high temperature drilling fluid cooling device[J]. Oil Field Equipment,2023,52(4):53-58.
[45]Zhang B,Yu B W,Sun J P,et al. Study on the different thermal insulation methods to control the wellbore temperature in deepwater wells[J]. Journal of Marine Science and Engineering,2026,14(5):411.
[46]Champness T,Worthen T,Finger J. Development and application of insulated drill pipe for high temperature,high pressure drilling[R]. Bakersfield,CA:Drill Cool Systems Incorporated,2008.
[47]Ali I,Khan M A,Ding Y,et al. Recent advances in thermally insulated drilling pipes:Materials,design strategies,and future directions[J]. Polymers,2026,18(8):1004.
[48]Zhang C,Sun J S,Huang X B,et al. Preparation of polymer-coated SiO₂ aerogel for weakening wellbore instability caused by heat transfer between the drilling fluid and well wall[J]. Geoenergy Science and Engineering,2025,247:213611.
[49]Finger J T,Jacobson R D,Whitlow G L,et al. Insulated drill pipe for high-temperature drilling[R]. Sandia National Laboratories,2000.
[50]Mccaffrey M. Thermally insulating coating for steel drill pipe[D]. San Luis Obispo:California Polytechnic State University,2013.
[51]Vetsak A,Besiou C,Zatonski V,et al. The insulated drill pipe - field experience and thermal model validation[C]//IADC/SPE International Drilling Conference and Exhibition,Galveston,Texas,USA,2024. SPE-217753-MS.
[52]Finger J T,Jacobson R D,Champness A T. Development and testing of insulated drillpipe[J]. SPE Drilling & Completion,2002,17(2):132-136.
[53]Wu Y X,Zhang Y F,Bettiri N,et al. A comprehensive evaluation of drill pipe insulation for downhole temperature management using physics-based models[C]//Proceedings of the 50th Workshop on Geothermal Reservoir Engineering,Stanford,CA,USA. 2025:10-12.
[54]宋先知,姚学喆,许争鸣,等.超深井控温钻井隔热涂层参数影响机制研究[J].石油钻探技术,2024,52(2):126-135.Song Xianzhi,Yao Xuezhe,Xu Zhengming,et al. Research on the influence mechanism of heat-insulating coating parameters in temperature-controlled drilling of ultra-deep well[J]. Petroleum Drilling Techniques,2024,52(2):126-135.
[55]Zhang H R,Su Y N,Liao M L,et al. Effects of different thermal insulated drill pipe deployment methods on wellbore temperature control in ultra-deep wells[J]. Petroleum Science,2025,22(10):4174-4194.
[56]Keller H H,Couch E J,Berry P M. Temperature distribution in circulating mud columns[J]. Society of Petroleum Engineers Journal,1973,13 (1):23-30.
[57]Beirute R M. A Circulating and shut-In well-temperature-profile simulator[J]. Journal of Petroleum Technology,1991,43(9):1140-1146.
[58]Edwardson M J,Girner H M,Parkison H R,et al. Calculation of formation temperature disturbances caused by mud circulation[J]. Journal of Petroleum Technology,1962,14 (4):416-426.
[59]Holmes C S,Swift S C. Calculation of circulating mud temperatures[J]. Journal of Petroleum Technology,1970,22(6):670-674.
[60]Kabir C S,Hasan A R,Kouba G E,et al. Determining circulating fluid temperature in drilling,workover,and well-control operations[J]. SPE Drilling & Completion,1996,11(2):74-79.
[61]Al Saedi A Q,Flori R E,Kabir C S. New analytical solutions of wellbore fluid temperature profiles during drilling,circulating,and cementing operations[J]. Journal of Petroleum Science and Engineering,2018,170:206-217.
[62]杨谋,孟英峰,李皋,等. 钻井全过程井筒-地层瞬态传热模型[J]. 石油学报,2013,34(2):366-371.Yang Mou,Meng Yingfeng,Li Gao,et al. A transient heat transfer model of wellbore and formation during the whole drilling process[J]. Acta Petrolei Sinica,2013,34(2):366-371.
[63]Yang M,Zhao X Y,Meng Y F,et al. Determination of transient temperature distribution inside a wellbore considering drill string assembly and casing program[J]. Applied Thermal Engineering,2017,118:299-314.
[64]Abdelhafiz M M,Hegelel A Jr,Oppelt J F. Temperature modeling for wellbore circulation and shut-In with application in vertical geothermal wells[J]. Journal of Petroleum Science and Engineering,2021,204:108660.
[65]Xiao D,Hu Y F,Meng Y F,et al. Research on wellbore temperature control and heat extraction methods while drilling in high-temperature wells[J]. Journal of Petroleum Science and Engineering,2022,209:109814.
[66]Ayling L J,Jenner J W,Elkins H. Continuous circulation drilling[C]//Offshore Technology Conference. Houston,Texas,USA:OTC,2002:OTC-14269-MS.
[67]张武辇,贾银鸽,张静,等. 阀式连续循环钻井装置的工业化应用探讨[J]. 石油钻采工艺,2014,36(6):1-6.Zhang Wunian,Jia Yin’ge,Zhang Jing,et al. Industrialized application of valve-type continuous circulation drilling device[J]. Oil Drilling & Production Technology,2014,36(6):1-6.
[68]Calderoni A,Masi S,Repetto C,et al. Managing pressure drilling with continuous circulation,a summary of Eni experience[C]//SPE Annual Technical Conference and Exhibition. Denver,Colorado,USA:SPE,2011:SPE-147147-MS.
[69]Johnson R,Zerari D,Salicantr P,et al. Continuous circulation technology to reduce drilling days in offshore West Africa:Case study[C]//SPE Nigeria Annual International Conference and Exhibition. Lagos,Nigeria:SPE,2019:SPE-198864-MS.
[70]刘均一,陈二丁,李光泉,等. 基于相变蓄热原理的深井钻井液降温实验研究[J]. 石油钻探技术,2021,49(1):53-58.Liu Junyi,Chen Erding,Li Guangquan,et al. Experimental study of drilling fluid cooling in deep wells based on phase change heat storage [J]. Petroleum Drilling Techniques,2021,49(1):53-58.
[71]Khaled M S,Wang N Y,Ashok P,et al. Downhole heat management for drilling shallow and ultra-deep high enthalpy geothermal wells[J]. Geothermics,2023,107:102604.
[72]Khaled M S,Chen D M,Ashok P,et al. Drilling heat maps for active temperature management in geothermal wells[J]. SPE Journal,2023,28(4):1577-1593.
[73]Mao L J,Wei C J,Jia H,et al. Prediction model of drilling wellbore temperature considering bit heat generation and variation of mud thermophysical parameters[J]. Energy,2023,284:129341.
[74]Wang C,Liu H,Yu G W,et al. Wellbore-heat-transfer-model-based optimization and control for cooling downhole drilling fluid[J]. Petroleum Science,2024,21(3):1955-1968.
[75]Khaled M S,Wang N Y,Ashok P,et al. Strategies for prevention of downhole tool failure caused by high bottomhole temperature in geothermal and high-pressure/high-temperature oil and gas wells[J]. SPE Drilling & Completion,2023,38(2):243-260.
|