Well SDTK-1 is China's first 10,000 m ultra-deep scientific exploration well with extremely complex downhole conditions. Its fourth and fifth casing sections are 10,000 m level deep and confronted with world class cementing challenges,including ultra-high temperature,multi-pressure systems,active oil,gas and water zones,lost circulation in fractured vuggy thief zones,and long irregular open hole sections. Conventional cementing materials,processes and supporting tools for ultra-deep wells fail to adapt themselves to the extreme operating conditions of this well. Aiming at three core engineering difficulties,namely sidetracking after drill string failure in the fourth casing section,cementing of the 10,000 m ultra-deep fifth casing section,and zonal isolation of oil,gas and water zones under a near-zero safe density window,this research combines laboratory research and full process field operation data to systematically analyze the technical bottlenecks of high strength cement plugs for sidetracking the fourth casing interval,managed-pressure cementing for the Φ206.38 mm liner in the fourth casing section,and composite zonal cementing via direct injection and reverse squeezing for the Φ139.7 mm liner in the fifth casing section. Four developed original technologies are fully elaborated,namely the high precision sidetracking cement plug technology for 10,000 m wells,multi-point dynamic ECD fine managed-pressure cementing technology,ultra-high temperature cement slurry system resistant to 240°C,and the direct injection and reverse squeezing zonal cementing process for 10,000 m wells. Field application results show that the overall cementing qualification rate of the fourth liner section reaches 82.5%,an Asian record of the deepest cementing operation with Φ206.38 mm casing. The overall cementing qualification rate of the fifth liner section hits 92.9%,and the qualification rate of barriers sealing hydrocarbon zones is 100%,establishing a new global record of the deepest liner cementing. The proposed technologies can provide critical theoretical references and practical engineering experience for cementing projects of 10,000 m level ultra-deep wells in China.