Temporary plugging fracturing,which activates natural fractures through hydraulic shearing and creates “self-supported” fracture systems derived from the shear dilation,has now become a key technical pathway for constructing volumetric geothermal reservoirs in hot dry rock. This research systematically reviews the research progress of temporary plugging-shearing fracturing technology for hot dry rock from two dimensions,namely laboratory simulation tests and representative engineering practices of enhanced geothermal systems (EGS). Existing physical simulation methods mostly assume constant normal loads,with insufficient high temperature adaptability and multi-field coupling simulation capacity,which leads to failure to truly reproduce the entire reservoir reconstruction process of deep hot dry rock. Current numerical simulations remain in a state of partial coupling and local matching,and a coupled model fully reproducing the whole temporary plugging-shearing process is still absent. Fewer high temperature shear constitutive models are available. Moreover,most of such models are modified from room-temperature models,and the constitutive model that couples shearing and seepage under real-time high temperature conditions is still absent. Finally,three core future research directions are proposed,including constructing a large-scale multi-field coupled physical simulation platform under constant normal stiffness conditions,developing numerical simulation methods for the full-process coupling of temporary plugging-shearing,and establishing a discrete fracture network (DFN) modeling framework constrained by multi-source data.