Journals
  Publication Years
  Keywords
Search within results Open Search
Please wait a minute...
For Selected: Toggle Thumbnails
Cementing Technologies for the Fourth and Fifth Casing Sections of Well SDTK-1
Yu Yongjin, , Ai Zhengqing , Wang Zhiguo , Liu Zhongfei , Sun Yiliu, , Li Pengpeng,
Xinjiang Oil & Gas    2026, 22 (3): 17-27.   DOI: 10.12388/j.issn.1673-2677.2026.03.002
Abstract (849)      PDF (742KB)(33)       Save

Well SDTK-1 is China's first 10,000 m ultra-deep scientific exploration well with extremely complex downhole conditions. Its fourth and fifth casing sections are 10,000 m level deep and confronted with world class cementing challenges,including ultra-high temperature,multi-pressure systems,active oil,gas and water zones,lost circulation in fractured vuggy thief zones,and long irregular open hole sections. Conventional cementing materials,processes and supporting tools for ultra-deep wells fail to adapt themselves to the extreme operating conditions of this well. Aiming at three core engineering difficulties,namely sidetracking after drill string failure in the fourth casing section,cementing of the 10,000 m ultra-deep fifth casing section,and zonal isolation of oil,gas and water zones under a near-zero safe density window,this research combines laboratory research and full process field operation data to systematically analyze the technical bottlenecks of high strength cement plugs for sidetracking the fourth casing interval,managed-pressure cementing for the Φ206.38 mm liner in the fourth casing section,and composite zonal cementing via direct injection and reverse squeezing for the Φ139.7 mm liner in the fifth casing section. Four developed original technologies are fully elaborated,namely the high precision sidetracking cement plug technology for 10,000 m wells,multi-point dynamic ECD fine managed-pressure cementing technology,ultra-high temperature cement slurry system resistant to 240°C,and the direct injection and reverse squeezing zonal cementing process for 10,000 m wells. Field application results show that the overall cementing qualification rate of the fourth liner section reaches 82.5%,an Asian record of the deepest cementing operation with Φ206.38 mm casing. The overall cementing qualification rate of the fifth liner section hits 92.9%,and the qualification rate of barriers sealing hydrocarbon zones is 100%,establishing a new global record of the deepest liner cementing. The proposed technologies can provide critical theoretical references and practical engineering experience for cementing projects of 10,000 m level ultra-deep wells in China.

Reference | Related Articles | Metrics

Progress and Application of the Key Technologies of Deep and Ultra-Deep Well Cementing

YU Yongjin, XIA Xiujian, WANG Zhiguo, LIAO Fuguo, LIU Binhui, DING Zhiwei,
Xinjiang Oil & Gas    2023, 19 (2): 24-33.   DOI: 10.12388/j.issn.1673-2677.2023.02.003
Abstract (791)      PDF (1607KB)(168)       Save

Deep and ultra-deep reservoirs are strategic alternatives for increasing reserves and production of hydrocarbons. Recently,significant progress has been made in deep well cementing,especially for special cementing working fluid systems(such as high temperature-resistant cementing additives,cement slurry tolerant of high temperature and large temperature deferences and ultra-high temperature cement slurry),high temperature-resistant spacer,cementing tools,and cementing technology such as precise managed-pressure cementing,gradual wellhead pressure-holding and prestressed cementing. The cement slurry and cementing technology developed independently in China have been applied to deep well cementing operations in Sichuan,Tarim and Bohai Bay and other basins,and present remarkable performance in the successful cementing operations of Well Pengshen 6,the deepest vertical well in Asia,and Well Hongxing 1,the first well in China featuring 8-section-and-8-completion,and Well Qiantan1,the well with the highest temperature in Dagang Oilfield. Nowadays,the increasing complexity of targets of hydrocarbon exploration and development leads to a series of new challenges for cementing deep and ultra-deep wells. Consequently,it is necessary to strengthen the research on the basic theory,key materials,working fluid system,functional tools and technologies for cementing deep and ultra-deep wells,so as to provide more powerful technical support for deep and ultra-deep oil and gas exploration and development.

Reference | Related Articles | Metrics